Support
Quotation and installation terms, materials, discontinued models and service, all in one place.
Included in the quotation
- Controllers, indicators, locks and emergency buttons
- Door drilling, wiring and installation
- Commissioning and function check
- Removal of existing equipment (on request)
- Room and HEPA filter differential pressure gauges (on request)
Not included
- Primary power supply to the controller (AC mains)
- Interface contacts on high-speed or automatic doors (by the door supplier)
- Ceiling access hatches for maintenance
- Steel conduit work in explosion-proof areas — must be provided by the client
Before installation
- We install after the fire or panel doors are in place, with frames fitted tight to the wall.
- Warped doors can make commissioning difficult.
- Controllers are mounted above the ceiling; the schedule is agreed in advance.
Payment terms
50% in advance · 50% after commissioning
Sites outside Seoul and overseas
Korea and worldwide · travel costs quoted separately
Small orders in Korea
Naver Smart Store
Controllers, indicators, locks and 1-room/2-door sets can be ordered directly (Korea only).
Open the storeBulk and export orders
Material quotation
- Payment: full amount in advance
- Shipping: same day if materials are ready before 4 p.m. (KST)
- Installation and primary power by the buyer
If an older model fails, it can be replaced with the successor below. We check the site wiring and recommend the right model.
| Discontinued model | Replacement |
|---|---|
| ISD-203 (old 3-door) | ISD-203R, ISD-203F |
| ISD-406 (old 6-door) | ISD-106-3R, ISD-106-6R, ISD-106F |
Yes. We travel to install at overseas plants and laboratories. We confirm the configuration and quotation from drawings and photos first, then ship the materials and install and commission on site. Travel costs are shown separately on the quotation.
Yes. Tell us the number of rooms, doors and sets and we send a first quotation; the final price is confirmed after checking the site. Drawings or photos make it more accurate.
The primary power supply to the controller (AC mains) is excluded. Everything after the controller — wiring, door drilling, installation and commissioning — is included.
Yes, with explosion-proof controllers and indicators. We do not do the steel conduit work in hazardous areas — the client must provide it.
Yes — for room pressure and for HEPA filters, with analog or digital gauges. We choose the locations, cut the panels, run the sensing tubing, install, and check zero and function — and can do it together with the door interlocks.
For installation: 50% in advance and 50% after commissioning. Material-only orders are paid in full in advance.
Yes. The power can be arranged so that the locks release when a fire signal comes in, coordinated with the fire and electrical contractors.
The waiting time after one door closes, before the next door may open, so the air in the airlock can recover. It is built into every controller.
Yes. Send your inquiry in English by email or through the quotation form and we reply by email.